| 1: |
bidding document 标书 |
| 2: |
矮柱;护柱 bollard |
| 3: |
安放工程 positioning |
| 4: |
安老院 home for the aged |
| 5: |
安老院 residential care home for elderly persons |
| 6: |
安全操作最高负荷;安全操作最高负荷量 maximum safe working load |
| 7: |
安全承载力 safe bearing capacity |
| 8: |
安全工作荷载 safe working load |
| 9: |
安全荷载 safety load |
| 10: |
安全荷载;安全载重 safe load |
| 11: |
安全间隙;安全距离 safety clearance |
| 12: |
安全截断开关 safety cutout switch |
| 13: |
安置 rehousing |
| 14: |
安置计划 rehousing programme |
| 15: |
安置类别 housing category |
| 16: |
安置行动拨款 rehousing operation vote |
| 17: |
安置援助计划 Rehousing Assistance Scheme |
| 18: |
岸墙;装卸堤 quay wall |
| 19: |
按价补偿 reimbursed at cost |
| 20: |
按价格表计算的合约 schedule of rates contract |
| 21: |
按揭 mortgage |
| 22: |
按揭贷款;按揭贷款额 mortgage loan |
| 23: |
按揭贷款限额 mortgage limit |
| 24: |
按揭供款 mortgage repayment |
| 25: |
按揭还款补助金 mortgage subsidy |
| 26: |
按揭还款补助金发放通知书 Notice of Payment of Subsidy |
| 27: |
按揭还款与入息比例平均数 mean mortgage-to-income ratio |
| 28: |
按揭金 mortgage money |
| 29: |
按揭契据 mortgage deed |
| 30: |
按揭人 mortgagor |
| 31: |
按量数付款工程合约 remeasurement contract |
| 32: |
按契约而持有业权;租赁土地 leasehold |
| 33: |
按月付租的租客 monthly tenant |
| 34: |
按折算 devalued at... |
| 35: |
暗钉;榫钉;销钉;定位销 dowel |
| 36: |
暗钉接合;榫钉接缝 dowel joint |
| 37: |
暗渠 covered drain |
| 38: |
暗渠;涵洞;排水渠 culvert |
| 39: |
暗锁;插锁 mortise deadlock |
| 40: |
暗线导管 concealed conduit |
| 41: |
暗置污水渠 covered sewer |
| 42: |
凹槽;管槽 chase |
| 43: |
凹圆边 coved edge |
| 44: |
凹圆瓦 coved tile |
| 45: |
奥氏体不锈钢 austenitic stainless steel |
| 46: |
拔桩测试 pile withdrawal test |
| 47: |
拔桩机 extractor |
| 48: |
拔桩机 pile extractor |
| 49: |
拔桩机 pile drawer |
| 50: |
把地图上的资料转为数码 digitization of a map |
| 51: |
把地图上的资料转为数码 map digitization |
| 52: |
把几个单位合为一组以一份合约出租 package letting |
| 53: |
把楼宇建筑位置移后 building setback |
| 54: |
把通花砖墙密封 encapsulation of grille panels |
| 55: |
白云岩 dolomite |
| 56: |
百岁砖 Besser block |
| 57: |
百叶窗;气窗 louvre window |
| 58: |
搬迁费用 removal charge |
| 59: |
搬迁及装修津贴 removal and decoration allowance |
| 60: |
搬迁津贴 removal allowance |
| 61: |
搬土机;铲泥车 loader |
| 62: |
搬移限于范围内 confined relocation |
| 63: |
搬运海沙许可证 Sand Removal Permit |
| 64: |
板架支撑 planking and strutting |
| 65: |
板模系统 formwork system |
| 66: |
板条 lath |
| 67: |
板条;木方 batten |
| 68: |
办公楼宇用地 office land |
| 69: |
办公楼宇用地发展策略 Office Land Development Strategy |
| 70: |
半独立单位 partly self-contained flat |
| 71: |
半个单位 half unit |
| 72: |
半间铺位 half-bay shop |
| 73: |
半建成构筑物;半建成搭建物 part-built structure |
| 74: |
半接头 half joint |
| 75: |
半连环型楼宇 half-interlocking-type building |
| 76: |
半砖墙;半砖厚墙 half-brick wall |
| 77: |
拌合料;混合物;组合 mix |
| 78: |
拌合物;混合物 mixture |
| 79: |
包差饷 inclusive of rates |
| 80: |
包差饷月租 monthly inclusive rent |
| 81: |
包差饷租金 inclusive rent |
| 82: |
包括容差的建屋量指标 product target including safety margin |
| 83: |
饱和含水量 saturation moisture content |
| 84: |
保护板;护木;挡板 fender |
| 85: |
保护层;保护罩 protective cover |
| 86: |
保护层;涂层 coat |
| 87: |
保护区 conservation area |
| 88: |
保护涂料 protective coat |
| 89: |
保护檐篷 protective canopy |
| 90: |
保险连杆 fusible link |
| 91: |
保养成本指数 Maintenance Cost Index |
| 92: |
保养工程完工证书 maintenance certificate |
| 93: |
保养期;保修期;维修责任期 defects liability period |
| 94: |
保养期;保修期;维修责任期 period of defects liability |
| 95: |
保养证明书;保修证明书 defects liability certificate |
| 96: |
保养制度 maintenance regime |
| 97: |
爆裂测试 burst tearing test |
| 98: |
爆裂强度 burst strength |
| 99: |
爆石 rock blasting |
| 100: |
爆炸品牌照 explosive licence |
| 101: |
爆钻法 drill and blast method |
| 102: |
贝克曼梁试验 Benkelman beam test |
| 103: |
背景资料表格 Background Information Form |
| 104: |
背面图 back elevation |
| 105: |
背入集水沟气隔 back inlet gully trap |
| 106: |
被逼迁 dispossessed |
| 107: |
被动损毁;被动破坏 passive failure |
| 108: |
被动土压力 passive earth pressure |
| 109: |
被动压力 passive resistance |
| 110: |
被封含水层 confined aquifer |
| 111: |
本地公务员建屋合作社 Local Officers' Co-operative Building Society |
| 112: |
本地公务员住屋计划 Housing Scheme for Local Government Officers |
| 113: |
崩积土 colluvial soil |
| 114: |
崩积土层 colluvial deposit |
| 115: |
崩积物;崩积土 colluvium |
| 116: |
崩塌;坍塌 collapse |
| 117: |
崩塌残痕;崩塌痕 failure scar |
| 118: |
崩塌后果评估 risk assessment of failure |
| 119: |
崩塌模式 mode of collapse |
| 120: |
泵水干管 pumping main |
| 121: |
泵水竖管 pump riser |
| 122: |
泵转轴 pump shaft |
| 123: |
泵转轴套筒 pump shaft sleeve |
| 124: |
比对投标工程费 comparative tendered amount |
| 125: |
比较估价法 comparison method of valuation |
| 126: |
币值化的乙种换地权益书 monetized Letter B |
| 127: |
必须安置类别 comprehensive category |
| 128: |
必须安置类别 compressive category |
| 129: |
必须迁置类别 compulsory rehousing category |
| 130: |
必须入住规定;必须在有关物业居住的规定 live-in requirement |
| 131: |
闭合差 closing error |
| 132: |
闭合的位置 closed position |
| 133: |
闭路电视监察器 closed-circuit television monitor |
| 134: |
闭路电视门口对讲机 closed-circuit television door-telephone |
| 135: |
庇护层;隔火层 refuge floor |
| 136: |
庇护间 refuge area |
| 137: |
壁炉地面 hearth |
| 138: |
壁柱;半露柱 pilaster |
| 139: |
避雷器 lightning arrester |
| 140: |
避雷针 lightning conductor |
| 141: |
避雷装置 lightning protection |
| 142: |
避雨亭 rain shelter |
| 143: |
边界墙 boundary wall |
| 144: |
边界条件 boundary condition |
| 145: |
边梁 edge beam |
| 146: |
边缘地带 edge |
| 147: |
边缘梁 marginal beam |
| 148: |
边缘区 fringe area |
| 149: |
编网钢筋 fabric reinforcement |
| 150: |
扁钢;条钢 flat bar |